{"id":4738,"date":"2022-03-04T09:56:55","date_gmt":"2022-03-04T08:56:55","guid":{"rendered":"https:\/\/dynfut.tamtomy.cz\/?p=4738"},"modified":"2022-03-04T09:56:55","modified_gmt":"2022-03-04T08:56:55","slug":"pseudo-digital-twin-as-a-predecessor-for-production-capacity-planning","status":"publish","type":"post","link":"https:\/\/dynfut.tamtomy.cz\/en\/pseudo-digital-twin-as-a-predecessor-for-production-capacity-planning\/","title":{"rendered":"Pseudo Digital Twin as a Predecessor for Production Capacity Planning"},"content":{"rendered":"<p>\u201cIt was our first use of simulation for operational planning,\u201c says Jan Slajer about the project that DYNAMIC FUTURE executed for the company KOSTAL CR in 2002. Why do they call it a pseudo digital twin and for how long of a cycle did they prepare the production line\u2019s permeability? This was the first order from the producer of mechatronic components and assemblies for automotive that laid the foundation for our long-term cooperation.<\/p>\n<p>Dynamic simulation models were quite new in our companies. According to J. Slajer, the companies perceived them to be complex like rocket science and only very progressive ones had the courage to use them. KOSTAL CR definitely belonged to those. \u201cIt\u2019s important to say that back then, a doctor of philosophy, a person with exceptional outlook and innovative thinking was the executive head. The idea of using our model came from him and proved to be effective,\u201d says J. Slajer.<\/p>\n<p>The project assignment was to create a dynamic simulation model of a B6 flat cable production that is regularly used for steering wheel communication and vehicle control modules. The objective was to increase the permeability of the entire production line, set an optimal status level of semi-finished products in semi-operational warehouses and determine the most suitable number of employees needed to operate the production devices considering the required production ratio of B6 parts. \u201cWe analyzed all parts of the production process and identified a bottleneck, in this case, it was a testing room. By adding another testing device, the production went up by 5 %,\u201d explains Petr Jaluvka, the second executive head of DYNAMIC FUTURE.<\/p>\n<p>The way KOSTAL CR cooperated with DYNAMIC FUTURE was exceptional. Every week, the customer sent production requirements to the consulting organization and got its optimal distribution back. \u201cIt was a pseudo digital twin, because currently, we create a dynamic simulation model and then hand it over to the client for use. Back then, it was a revolutionary technology, so we performed the simulations for the customer,\u201d says P. Jaluvka while adding that the speed of output delivery was crucial \u2013 and DYNAMIC FUTURE had 24 hours for processing and evaluating data.<\/p>\n<p>\u201cWe used the WITNESS Optimizer module, where we were setting up the parameters and the module calculated the most suitable solution based on criteria functions. Optimization parameters were: size of the production batch on pre-assembly of flat cables, size of inter-operational supply of flat cables and determination of the operators number. The criteria functions were maximal production in the required structure, maximal workers utilization and the combination of both. Based on these, the most suitable solution was determined,\u201d explains J. Slajer.<\/p>\n<p>From today\u2019s perspective, it\u2019s planning long in advance. For example, food companies plan their production daily, and so are some of the automotive industries.\u201dThe ongoing production time is what matters the most. In some cases, just in time is standard, while elsewhere is just in sequence \u2013 in this case, the company has four hours to deliver the goods since the order. Cooperation with KOSTAL CR shows where and how quickly the development is moving. The current smart companies work with dynamic simulation models daily and nobody wonders. Twenty years ago, our pseudo digital twin was very progressive and became the beginning of a long-term cooperation,\u201d says J. Slajer.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u201cIt was our first use of simulation for operational planning,\u201c says Jan Slajer about the project that DYNAMIC FUTURE executed for the company KOSTAL CR in 2002. Why do they call it a pseudo digital twin and for how long of a cycle did they prepare the production line\u2019s permeability? This was the first order [&hellip;]<\/p>\n","protected":false},"author":2869,"featured_media":4547,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Pseudo Digital Twin as a Predecessor for Production Capacity Planning - DYNAMIC FUTURE<\/title>\n<meta name=\"description\" content=\"Prvn\u00ed simulace pro operativn\u00ed pl\u00e1nov\u00e1n\u00ed d\u011blali DYNAMIC FUTURE v roce 2002. Takzvan\u00e9 pseudo digit\u00e1ln\u00ed dvoj\u010de odstartovalo dlouhodobou spolupr\u00e1ci.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pseudo Digital Twin as a Predecessor for Production Capacity Planning - DYNAMIC FUTURE\" \/>\n<meta property=\"og:description\" content=\"Prvn\u00ed simulace pro operativn\u00ed pl\u00e1nov\u00e1n\u00ed d\u011blali DYNAMIC FUTURE v roce 2002. Takzvan\u00e9 pseudo digit\u00e1ln\u00ed dvoj\u010de odstartovalo dlouhodobou spolupr\u00e1ci.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dynfut.tamtomy.cz\/en\/pseudo-digital-twin-as-a-predecessor-for-production-capacity-planning\/\" \/>\n<meta property=\"og:site_name\" content=\"DYNAMIC FUTURE\" \/>\n<meta property=\"article:published_time\" content=\"2022-03-04T08:56:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dynfut.tamtomy.cz\/wp-content\/uploads\/2021\/06\/smartmockups_kq6zsqgp.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1257\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Souad Kratochv\u00edlov\u00e1 Kafi\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Souad Kratochv\u00edlov\u00e1 Kafi\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/dynfut.tamtomy.cz\/en\/pseudo-digital-twin-as-a-predecessor-for-production-capacity-planning\/\",\"url\":\"https:\/\/dynfut.tamtomy.cz\/en\/pseudo-digital-twin-as-a-predecessor-for-production-capacity-planning\/\",\"name\":\"Pseudo Digital Twin as a Predecessor for Production Capacity Planning - DYNAMIC FUTURE\",\"isPartOf\":{\"@id\":\"https:\/\/dynfut.tamtomy.cz\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/dynfut.tamtomy.cz\/en\/pseudo-digital-twin-as-a-predecessor-for-production-capacity-planning\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/dynfut.tamtomy.cz\/en\/pseudo-digital-twin-as-a-predecessor-for-production-capacity-planning\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/dynfut.tamtomy.cz\/wp-content\/uploads\/2021\/06\/smartmockups_kq6zsqgp.jpg\",\"datePublished\":\"2022-03-04T08:56:55+00:00\",\"dateModified\":\"2022-03-04T08:56:55+00:00\",\"author\":{\"@id\":\"https:\/\/dynfut.tamtomy.cz\/en\/#\/schema\/person\/2047edcdd4b754c532d0ea8eb7769179\"},\"description\":\"Prvn\u00ed simulace pro operativn\u00ed pl\u00e1nov\u00e1n\u00ed d\u011blali DYNAMIC FUTURE v roce 2002. Takzvan\u00e9 pseudo digit\u00e1ln\u00ed dvoj\u010de odstartovalo dlouhodobou spolupr\u00e1ci.\",\"breadcrumb\":{\"@id\":\"https:\/\/dynfut.tamtomy.cz\/en\/pseudo-digital-twin-as-a-predecessor-for-production-capacity-planning\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/dynfut.tamtomy.cz\/en\/pseudo-digital-twin-as-a-predecessor-for-production-capacity-planning\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/dynfut.tamtomy.cz\/en\/pseudo-digital-twin-as-a-predecessor-for-production-capacity-planning\/#primaryimage\",\"url\":\"https:\/\/dynfut.tamtomy.cz\/wp-content\/uploads\/2021\/06\/smartmockups_kq6zsqgp.jpg\",\"contentUrl\":\"https:\/\/dynfut.tamtomy.cz\/wp-content\/uploads\/2021\/06\/smartmockups_kq6zsqgp.jpg\",\"width\":1920,\"height\":1257},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/dynfut.tamtomy.cz\/en\/pseudo-digital-twin-as-a-predecessor-for-production-capacity-planning\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/dynfut.tamtomy.cz\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Pseudo Digital Twin as a Predecessor for Production Capacity Planning\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/dynfut.tamtomy.cz\/en\/#website\",\"url\":\"https:\/\/dynfut.tamtomy.cz\/en\/\",\"name\":\"DYNAMIC FUTURE\",\"description\":\"digital twins (digit\u00e1ln\u00ed dvoj\u010data) pro p\u0159esn\u00e9 rozhodov\u00e1n\u00ed v pr\u016fmyslu a logistice\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/dynfut.tamtomy.cz\/en\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/dynfut.tamtomy.cz\/en\/#\/schema\/person\/2047edcdd4b754c532d0ea8eb7769179\",\"name\":\"Souad Kratochv\u00edlov\u00e1 Kafi\",\"url\":\"https:\/\/dynfut.tamtomy.cz\/en\/author\/souaddigitaalcz\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Pseudo Digital Twin as a Predecessor for Production Capacity Planning - DYNAMIC FUTURE","description":"Prvn\u00ed simulace pro operativn\u00ed pl\u00e1nov\u00e1n\u00ed d\u011blali DYNAMIC FUTURE v roce 2002. Takzvan\u00e9 pseudo digit\u00e1ln\u00ed dvoj\u010de odstartovalo dlouhodobou spolupr\u00e1ci.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Pseudo Digital Twin as a Predecessor for Production Capacity Planning - DYNAMIC FUTURE","og_description":"Prvn\u00ed simulace pro operativn\u00ed pl\u00e1nov\u00e1n\u00ed d\u011blali DYNAMIC FUTURE v roce 2002. Takzvan\u00e9 pseudo digit\u00e1ln\u00ed dvoj\u010de odstartovalo dlouhodobou spolupr\u00e1ci.","og_url":"https:\/\/dynfut.tamtomy.cz\/en\/pseudo-digital-twin-as-a-predecessor-for-production-capacity-planning\/","og_site_name":"DYNAMIC FUTURE","article_published_time":"2022-03-04T08:56:55+00:00","og_image":[{"width":1920,"height":1257,"url":"https:\/\/dynfut.tamtomy.cz\/wp-content\/uploads\/2021\/06\/smartmockups_kq6zsqgp.jpg","type":"image\/jpeg"}],"author":"Souad Kratochv\u00edlov\u00e1 Kafi","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Souad Kratochv\u00edlov\u00e1 Kafi","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/dynfut.tamtomy.cz\/en\/pseudo-digital-twin-as-a-predecessor-for-production-capacity-planning\/","url":"https:\/\/dynfut.tamtomy.cz\/en\/pseudo-digital-twin-as-a-predecessor-for-production-capacity-planning\/","name":"Pseudo Digital Twin as a Predecessor for Production Capacity Planning - DYNAMIC FUTURE","isPartOf":{"@id":"https:\/\/dynfut.tamtomy.cz\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dynfut.tamtomy.cz\/en\/pseudo-digital-twin-as-a-predecessor-for-production-capacity-planning\/#primaryimage"},"image":{"@id":"https:\/\/dynfut.tamtomy.cz\/en\/pseudo-digital-twin-as-a-predecessor-for-production-capacity-planning\/#primaryimage"},"thumbnailUrl":"https:\/\/dynfut.tamtomy.cz\/wp-content\/uploads\/2021\/06\/smartmockups_kq6zsqgp.jpg","datePublished":"2022-03-04T08:56:55+00:00","dateModified":"2022-03-04T08:56:55+00:00","author":{"@id":"https:\/\/dynfut.tamtomy.cz\/en\/#\/schema\/person\/2047edcdd4b754c532d0ea8eb7769179"},"description":"Prvn\u00ed simulace pro operativn\u00ed pl\u00e1nov\u00e1n\u00ed d\u011blali DYNAMIC FUTURE v roce 2002. Takzvan\u00e9 pseudo digit\u00e1ln\u00ed dvoj\u010de odstartovalo dlouhodobou spolupr\u00e1ci.","breadcrumb":{"@id":"https:\/\/dynfut.tamtomy.cz\/en\/pseudo-digital-twin-as-a-predecessor-for-production-capacity-planning\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dynfut.tamtomy.cz\/en\/pseudo-digital-twin-as-a-predecessor-for-production-capacity-planning\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/dynfut.tamtomy.cz\/en\/pseudo-digital-twin-as-a-predecessor-for-production-capacity-planning\/#primaryimage","url":"https:\/\/dynfut.tamtomy.cz\/wp-content\/uploads\/2021\/06\/smartmockups_kq6zsqgp.jpg","contentUrl":"https:\/\/dynfut.tamtomy.cz\/wp-content\/uploads\/2021\/06\/smartmockups_kq6zsqgp.jpg","width":1920,"height":1257},{"@type":"BreadcrumbList","@id":"https:\/\/dynfut.tamtomy.cz\/en\/pseudo-digital-twin-as-a-predecessor-for-production-capacity-planning\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dynfut.tamtomy.cz\/en\/"},{"@type":"ListItem","position":2,"name":"Pseudo Digital Twin as a Predecessor for Production Capacity Planning"}]},{"@type":"WebSite","@id":"https:\/\/dynfut.tamtomy.cz\/en\/#website","url":"https:\/\/dynfut.tamtomy.cz\/en\/","name":"DYNAMIC FUTURE","description":"digital twins (digit\u00e1ln\u00ed dvoj\u010data) pro p\u0159esn\u00e9 rozhodov\u00e1n\u00ed v pr\u016fmyslu a logistice","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dynfut.tamtomy.cz\/en\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/dynfut.tamtomy.cz\/en\/#\/schema\/person\/2047edcdd4b754c532d0ea8eb7769179","name":"Souad Kratochv\u00edlov\u00e1 Kafi","url":"https:\/\/dynfut.tamtomy.cz\/en\/author\/souaddigitaalcz\/"}]}},"_links":{"self":[{"href":"https:\/\/dynfut.tamtomy.cz\/en\/wp-json\/wp\/v2\/posts\/4738"}],"collection":[{"href":"https:\/\/dynfut.tamtomy.cz\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dynfut.tamtomy.cz\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dynfut.tamtomy.cz\/en\/wp-json\/wp\/v2\/users\/2869"}],"replies":[{"embeddable":true,"href":"https:\/\/dynfut.tamtomy.cz\/en\/wp-json\/wp\/v2\/comments?post=4738"}],"version-history":[{"count":1,"href":"https:\/\/dynfut.tamtomy.cz\/en\/wp-json\/wp\/v2\/posts\/4738\/revisions"}],"predecessor-version":[{"id":4739,"href":"https:\/\/dynfut.tamtomy.cz\/en\/wp-json\/wp\/v2\/posts\/4738\/revisions\/4739"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dynfut.tamtomy.cz\/en\/wp-json\/wp\/v2\/media\/4547"}],"wp:attachment":[{"href":"https:\/\/dynfut.tamtomy.cz\/en\/wp-json\/wp\/v2\/media?parent=4738"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dynfut.tamtomy.cz\/en\/wp-json\/wp\/v2\/categories?post=4738"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dynfut.tamtomy.cz\/en\/wp-json\/wp\/v2\/tags?post=4738"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}